Request ID
18563
Date Received
Date Resolved
Details

See notes

Resolution
See notes
Notes
Date

I am writing to request information with regards to the council’s current and future plans for Charging Infrastructure relating to Electric Vehicles, including street cleaning, drain cleaning and waste and recycling collection vehicles at council depots.

1. Can you please confirm if any of your council depots have the following charges in place at present from the below list? Yes, Toutley Depot has 4x 7kW.
a) Please can you provide the number of each you have access to: 4x 7kW
b) If not, can you confirm if there are plans in place to have any of these fitted: Not applicable
c) If so which number(s): Not applicable
d) If so, do you know when: Not applicable

Charger List
• AC Charging up to a 22 KW AC charger with Type 2 connection?
• DC Charging up to 150 kw using a CCS2 Connector?
• AC Charging using up to 43 KW with Type 2 connection?
• DC charging up to 250 KW using CCS2 Connector?
• AC charging using 22 kw charger with Type 2 connection?
• 3 phase connection using either 32 amp or 63-amp power supply?
• AC charging using standard Type 2 connection with a 7.5 kw or 22kw power supply?
• 13-amp socket via an alternative cable

Give website feedback