See notes
These questions relate, specifically to council owned public car parks:
1. Do the council currently have any electric vehicle charging points installed throughout their public car parks?
Yes.
2. If no, are the council looking at deploying electric vehicle charging points and if so what are the timescales involved?
Not applicable.
3. If yes how many and what capacity i.e. 7kW, 22kW, 50kW etc. Please provide a breakdown per location.
• Bulmershe Leisure Centre: 1x fast charger, 2x connector
• California Country Park: 2x fast charger, 4x connector
• Carnival pool: 2x fast charger, 4x connector
• Dinton Pastures Country Park: 1x fast charger, 2x connector
• Mereoak Park & Ride: 2x rapid charger, 6x connector
• Winnersh Triangle Park & Ride: 2x rapid charger, 6x connector
• Wokingham Council Offices: 1x rapid charger, 3x connector
4. Who is the manufacturer of the charge points installed?
Various.
5. When were the charge points installed?
2015 to 2021.
6. When does the existing contract expire?
There are various agreements in place.
7. Are the council looking to increase the number of EV bays available at their public car parks and what will be the determining factor as to when this takes place?
Yes, planned for 2022.
The questions relate, specifically, to the council offices, depots and other staff based sites:
8. Do the council currently have any electric vehicle charging points installed throughout their offices and depot facilities?
Yes.
9. If no, are the council looking at deploying electric vehicle charging points and if so what are the timescales involved?
Not applicable.
10. If yes how many and what capacity i.e. 7kW, 22kW, 50kW etc. Please provide a breakdown per location.
• Toutley Depot: 1x rapid charger, 3x connector
• Carnival Pool MCP: 2x fast charger, 4x connector
• Arnett Avenue: 2x fast charger, 4x connector
• Cantley Pavillion: 2x fast charger, 4x connector
• Farley Hill Primary: 5x fast charger, 10x connector
11. Who is the manufacturer of the charge points installed?
Various.
12. When were the charge points installed?
2015 to 2021.
13. When does the existing contract expire?
There are various agreements in place.
14. Are the council looking to increase the number of EV bays installed available at their offices and depot facilities and what will be the determining factor as to when this takes place?
Yes, planned for 2022.
These are general questions that relate to the council strategy with regards to the deployment of electric vehicle charging infrastructure:
15. Do the council have a dedicated electric vehicle charging strategy? If yes please either provide a copy or direct me to where this can be downloaded/viewed.
No. Not applicable.
16. Which departments within the council are responsible for the deployment of electric vehicle charging infrastructure, if more than one please list them.
Energy Team and Transport Planning Team.
17. Who are the primary contacts within each department, name and job title is sufficient.
Hoyte Swager, Energy Officer. Sofia Charalampidou, Senior Transport Planner.