Last updated:
8th August 2023
See answers to previous information requests
How to search
- Select a year and/or a month from the drop down list
- Type a subject into the 'Subject keyword(s):' search (Optional)
- Click 'Search' button
Alternatively click 'View' to browse through all received requests.
This search is for our information requests from September 2020 onward. You can also visit our previous Disclosure Log to see requests received before this period.
EV Charging
See notes
I am writing to request information with regards to the council’s current and future plans for Charging Infrastructure relating to Electric Vehicles, including street cleaning, drain cleaning and waste and recycling collection vehicles at council depots.
1. Can you please confirm if any of your council depots have the following charges in place at present from the below list? Yes, Toutley Depot has 4x 7kW.
a) Please can you provide the number of each you have access to: 4x 7kW
b) If not, can you confirm if there are plans in place to have any of these fitted: Not applicable
c) If so which number(s): Not applicable
d) If so, do you know when: Not applicable
Charger List
• AC Charging up to a 22 KW AC charger with Type 2 connection?
• DC Charging up to 150 kw using a CCS2 Connector?
• AC Charging using up to 43 KW with Type 2 connection?
• DC charging up to 250 KW using CCS2 Connector?
• AC charging using 22 kw charger with Type 2 connection?
• 3 phase connection using either 32 amp or 63-amp power supply?
• AC charging using standard Type 2 connection with a 7.5 kw or 22kw power supply?
• 13-amp socket via an alternative cable